Project Description:
Mast Group has been contracted out to provide the full design package for water, wastewater, fire and electrical networks for Al Dabaa housing project .
Scope of work
The Complete infrastructure works including drawings, BOQs, specifications and Tender Documents of the following :
Water & Fire networks consisting of :
UPVC pipes with diameters ranging from 150 – 300 mm
Sewage networks consisting of :
Gravity UPVC pipes with diameters ranging from 200- 600 mm ,
Electrical works consisting of :
High , Medium and low voltage networks in addition to the substations and distributors.
Approximate construction cost approximately 75,000,000 EGP