Scope:
The Factory was established in 2000, it started with a Double Coated Duplex Board Line with an annual production capacity of 60,000 tones/year, increasing to 180,000. The scope of work compromised the full infrastructure design of water supply ,drainage, irrigation and fire fighting systems.