Scope:
The factory was established in 2007 the 10th of Ramadan City, covering an area of about 20000 m2 . The scope of work compromised the full infrastructure design of water supply ,drainage, irrigation and fire fighting systems.
Scope:
The factory was established in 2007 the 10th of Ramadan City, covering an area of about 20000 m2 . The scope of work compromised the full infrastructure design of water supply ,drainage, irrigation and fire fighting systems.
Hi Tech Lock Factory
Industrial Projects
Al Ahram Security