Scope of work
Providing full design, drawings, BOQs, specifications and Tender Documents of the following :
Design of water main pipeline 38 Km length and 700 mm diameter in addition to the water hammer analysis .
Design of water main pipeline from the water tank to the technology city in addition to the water hammer analysis .
Water tank design 2000 m3 including the following :
- Water pumps
- Electrical substation
- Maintain warehouse
- Generators
- Administration building